We are trying to move in within 3 weeks so there is a lot left to do. Steve spends a week prepping to pour the back porch and steps:
By May 23rd, the back porch area is finished:
We still have inside handrails and outside handrails and railing:
The front area needs about 10 yards of topsoil. Then the 2 trees and bushes removed from the yard can be put back almost in the same place they came from:
After about 26 inspections, we have only 2 left: the final inspections tomorrow, May 31st.
Kathy – Mon, 11/22/2010 – 12:39pm