Finishing the cement

Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, Part 7

With the basement walls done, we now had to finish the basement slab. There was a lot of prep work to do.

Footing drains had to be installed all the way around the outside of the cement footing:

IMGP2528.JPG

There was a lot of foam board to install under the slab:

IMGP2531.JPG

Footings to form (they will hold up posts for beams):

IMGP2534.JPG

Sumps for the footing drain and washing machine:

IMGP2540.JPG

Connecting the footing drain to the sump:

IMGP2541.JPG

Basement stairwell landing drain:

IMGP2545.JPG

Rock thrower giving us the crush rock need for the 4" gravel base for the slab:

IMGP2557.JPG

Finally putting the pink foam down on top of the compacted crushed rock:

IMGP2565.JPG

On pour day we had a big crew:

IMGP2574.JPG

It started raining hard a little after this. Let's just say we had a tarp up with holes in it to drip into buckets:

IMGP2610.JPG

The next day, the block lights for the basement go in:

IMGP2621.JPG

Kathy – Sat, 11/20/2010 – 5:35pm