Warming Up
Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, Part 7, Part 8, Part 9, Part 10, Part 11, Part 12
It's January now and we have gas but no real heat, or insulation for that matter. The hold up is getting all the electrical, plumbing and radiant floor heating distributed throughout the walls. In addition, light boxes and canned lights must be installed, hooked up, tested, and inspected.
With inspections done, on January 13th we can insulate the walls with BIBS (blown in insulation):
Steve works on the water heater/radiant floor heating system. We want to make sure there are no leaks or problems before we cover it all up with insulation:
After a week of successful heating with no problems, the rest of the insulation is installed:
Kathy – Mon, 11/22/2010 – 8:09am